Day 300, Year 6: Success!!!

Day 300, Year 6: Success!!!
Date: Saturday, August 20, 2011
Weather: Continued Warm Weather, 82 degrees F, Sunny
Location: Eel Pond, Woods Hole, Massachusetts

I hope I’m not speaking too soon, but it does appear that we have solved the problem of the leaky pump-out hose. After getting a new gasket installed in our car exhaust system at Midas this morning, we headed to Windbird in Woods Hole and took off for Falmouth. We made the 12 noon bridge opening and by 3 pm we were back in Eel Pond on our mooring. It took about an hour to get to Falmouth, about an hour to get the boat’s holding tank pumped out and water tanks filled, and another hour to return. It was a beautiful afternoon and we really enjoyed the trek to and from Falmouth Harbor. Mark was too anxious to get back and get the work done to stay out and enjoy the day, so we reluctantly came right back. Once we were in Eel Pond, Mark got down to the dirty work of removing the leaky pump-out hose. Like doing any work on a boat, one job leads to another. In order to get to the hose to remove it, the entire main cabin closet had to be emptied as well as one locker under our starboard settee. That locker holds all of our painting, sanding, epoxy work, and dinghy repair supplies. Once all of that was removed, including the shelving in the closet, Mark started removing old, no longer used hoses, and the offending, leaky pump out hose. I took the shelving and other items to shore to wash them down using the shore water supply and returned with an overflowing bucket of water to wash the salt water off Windbird from the trip to Falmouth. Now that Mark has the hull polished and shiny, I feel like I need to keep the saltwater washing off. By 6 pm, Mark was finished-in more ways than one. He had completed the installation of the new hose and he was exhausted and could do no more work. I had organized and repackaged the supplies that go under the starboard settee, but we were both too tired to put them away. Tomorrow morning we’ll get everything put away and we should know by then if the “fix” is working. What an ordeal caused by the tiniest hairline crack in a hose.

While we were working on getting the car and boat repairs done, Heather and Jed were dealing with their shed issue. Unfortunately, the kit for the shed they decided on has a three to four-week wait for delivery, so in the meantime we will work on getting the foundation posts in place and get the shed assembled in time for Heather’s birthday on September 30-at least that is the new goal.

110820 Day 300 Cape Cod, USA–Falmouth Harbor

Day 299, Year 6: Working on a Possible Solution

Day 299, Year 6: Working on a Possible Solution
Date: Friday, August 19, 2011
Weather: Warming Up, 84 degrees F
Location: Eel Pond, Woods Hole, Massachusetts

We’re still working on a solution to getting our holding tank pumped out. Yesterday when the Falmouth Harbor Master had no suggestions for us, we weren’t sure what to do. But we made calls today and found that there are pump out facilities at the dock in Falmouth. We then called Martha’s Vineyard and found that they have three pump out boats–one in Vineyard Haven, one in Oak Bluffs, and one in Edgartown. Supposedly if we sail there and give a call, they will come right out. How very different that is from this side of the sound where there is one boat for many harbors and the boat can never come just when you call. We’ll probably sail to Vineyard Haven tomorrow, get pumped out, and then return to Woods Hole for the night. Or we might spend the night, but we are just anxious to get pumped out and then get to work on fixing the problem. And that’s probably better done where we can quickly get to land to buy additional supplies for the fix if needed. Hopefully by Sunday we will have this issue worked out.

We are also working with Heather and Jed in designing and planning the building of a garden storage shed for them. We’re still at the point of getting estimates to decide if it is cheaper to build your own from scratch or to buy one of the kits that you put together. The estimate I got from the local lumber company today for the materials needed to build an 8 foot by 10 foot shed was about $1500. You can buy a kit for $1800. Now Heather and Jed just have to look at the fine print on the kits and find out if the quality of materials is comparable to building your own from scratch. If so, the kit will probably win. But the estimate we had on materials from two years ago was almost half of the current estimate, so they also have to figure out if they can afford the additional amount. Mark works Monday but then doesn’t work again for most of next week. It’s a perfect time for a building project if decisions can be made that fast.

110819 Day 299 Cape Cod, USA–Superman Sam and the Lantern Tree

Day 298, Year 6: Holding Tanks–Ugh!

Day 298, Year 6: Holding Tanks–Ugh!
Date: Thursday, August 18, 2011
Weather: Another Gorgeous, Sunny Day, 75 degrees F
Location: Eel Pond, Woods Hole, Massachusetts

After reading yesterday’s log, our daughter Heather thought we were ready to get rid of Windbird. We’re not that desperate yet! It was a day with many bumps and I was overly negative, but we are certainly not at that point. We just need to find the money to do the repairs needed. But money doesn’t solve everything. Our most pressing problem, the full holding tank and pump out hose with a leak, got more complicated today. We called the Harbor Master early and the news we got was not good. The only pump out boat for this entire area is on the hard and will not be ready to go back in the water for at least a week, maybe longer. That was when I said, “Ugh!” I totally agree with the environmental regulations regarding No Discharge in sensitive areas, but if you are going to have regulations, you have to have the things needed to make it work. Having only one pump-out boat with no back-up in an area with so many boats is just not acceptable. We moved off Windbird and to Heather and Jed’s today, but if we cannot find some alternate way of getting the boat pumped out by Saturday, we will just have to sail offshore south of Martha’s Vineyard, discharge the waste, and return. It is a long trek, but that’s what we’ll do if necessary. We will call the Harbor Masters in Hyannis and Martha’s Vineyard tomorrow and see if we can get pumped out at either of those places on Saturday, but if that doesn’t work, we’ll just sail out to sea.

We stayed on Windbird this morning and got a few jobs done before heading into Falmouth to pick up Sam and Jonah. Mark got the brackets that hold the new stove in place and the installation was quick and easy. I did some routine cleaning and got us ready for the our two nights away. Unfortunately I didn’t have time to work on the website. Justin gave us so many good ideas last night, but I’ll just hope I can remember them all and start the work tomorrow morning. Heather came come with us when we left Woods Hole today because Cape Light Compact was doing an energy audit on the house. It was quite an involved procedure that took all afternoon and most interesting to watch. I couldn’t believe that Sam and Jonah both slept through the whole thing, but they did. We had a delightful dinner on the deck and now we’ll settle in the for the night.

110818 Day 298 Cape Cod, USA–Energy Efficiency Testing

Day 297, Year 6: The Hundredth Monkey

Day 297, Year 6: The Hundredth Monkey
Date: Wednesday, August 17, 2011
Weather: Gorgeous, Sunny Day, 75 degrees F
Location: Eel Pond, Woods Hole, Massachusetts

Having a whole day with both of us at home turned out not to be such a good idea-too much time to focus on problematic issues. All of those ‘little’ things that have been going wrong with the boat all of a sudden didn’t seem so ‘little’ any longer. It was like the pond half covered with lily pads that overnight became totally covered. The floor in the aft cabin needs major structural work. We have been ignoring that fact, but the time has come to do something about it. The teak deck is no worse than it was last week or the week before, but today it looked worse to me and we both realized that we can’t wait until we can afford to replace it. We have to do something in the meantime. We got a call from the sewing machine repair man and the cost of repairing the SailRite is going to be $200. That’s a fourth of the cost of a new machine. Ouch! Then there is the inverter/battery issue. Being on a mooring, we have to run the engine to charge the batteries and the charge is just not holding. This could mean replacing the monitor for battery charging, or worse yet, replacing the six AGM batteries to the tune of $2000 to $3000 dollars. Let’s hope the problem is the monitor as that is a cheaper problem to fix, maybe $500. Another big ticket item that is failing is my computer. I can do word processing, but when I try to edit photos or get online, the screen driver fails and there is no image. It is six years old, and it has been so faithful and hardy, being used out in the cockpit in all kinds of weather. It has been like my best friend all around the world, but I think it is time to replace it. Sadness. And then along came the realization that we have a leak in the hose that goes from the holding tank to the pump out on deck. And it has been leaking into the floor of the main cabin closet. Since the tank was pumped out last Friday, we have noticed a sewer smell that we just couldn’t track down. Yesterday Mark decided to investigate the pump out hose, so we emptied the main hall closet, starting at the top. Everything was dry all the way to the bottom and there we found a split in the hose. There should be nothing in the pipe to leak out except when pumping out, but after cleaning up the dampness at the bottom of the closet, I flushed the toilet and a little more liquid seeped out. So the tank must be full and backed up into the pipe. It was late in the evening by the time we discovered this, so we decided to make it through the night and deal with it tomorrow. We will call early to see if we can be pumped out immediately, and if so, we can then go buy new sanitary hose and install it tomorrow. If we can’t be pumped out tomorrow, then we will have to leave the boat until the problem can be fixed. Mark works on Friday, so if it is not possible to be pumped out tomorrow, the fix will have to wait until Saturday. Having to use a holding tank is always problematic. They smell no matter what you do. We have a very expensive SaniGuard filter on the air vent to keep odors from leaking overboard and we are using the very expensive holding tank treatment you buy at West Marine. Those two things usually work, but nothing can keep a sewage leak from smelling, no matter how tiny the leak. Most of the waters around the Cape are No Discharge areas by law, so even if you aren’t environmentally conscious, you have to use a holding tank and never discharge overboard. But there is only one pump out boat that serves many harbors, so it is not readily available. In the rest of the world, except for New Zealand and Australia, cruisers just don’t use their holding tanks. So we really haven’t had to deal with this since living in Boston. And there we had a pump out boat that came religiously once a week in the summer and once every two weeks in the winter. We also used our Lectro-san, an onboard sewage sanitation plant. They are not legal in No Discharge zones, however, so it doesn’t help us here. Okay, I’ve vented. I know I’m sounding very much like Eeyore, so now I’ll focus on the good things that happened today.

The first good surprise of the day was the news that only a gasket, not an entire exhaust system, is needed for our car. We’ll hold our breath on that one and hope that on Saturday morning when Midas replaces the gasket that they don’t find anything else wrong. The second good surprise was a call from Heather at lunch time. She had taken the day off to take the boys to the dentist and they decided to come to Woods Hole and have lunch with Jed. When they sat down at Captain Kidd’s, Sam told Heather she should call Oma and Granddad and invite us to lunch. So she did, and we did. We had a delightful lunch followed by a dinghy ride with Heather and the boys. We took the dinghy under the bridge and out into Great Harbor. It was such a beautiful day and it was a delight to bounce around in the waves in the harbor with our daughter and Sam and Jonah.. Sam was in the bow of the dinghy on lookout for other boats and Jonah was helping steer with Granddad. Then another grandchild delight ended the day. We had a 7 pm call with Justin to go over website issues. We called on Skype and found that Ziggy was on the other end, so we hooked up our cameras and talked to Ziggy. He showed us his new wagon that we sent to him as an early Christmas present. The Radio Flyer red metal wagon has a canopy top for shade and when it arrived Ziggy called it a tent. He sleeps and eats in it and calls it his house. Ziggy is so cute and is such a happy little guy, but when it came time to blow kisses of farewell he said he couldn’t do it because Oma and Granddad were stuck in the computer and couldn’t receive the kisses. But we got lots of smiles and that will just have to do until we get ‘unstuck.’ Ziggy went with Jo into another room while we talked about the new website with Justin. He could actually share his computer screen with us so he could show us how to edit and change things on the site. There are new slide shows to set up and manage as well as the regular text. We probably only comprehended about half of what he tried to show us, but little by little we will get it. He is fast and very good at website design, so it’s a stretch for us to understand even half. We ate a late dinner and went to bed exhausted. Hopefully some of the boat problems can be solved or not seem so overwhelming tomorrow.

110817 Day 297 Cape Cod, USA–Lunch Time Fun with Grandkids

Day 296, Year 6 Just a Work Day

Day 296, Year 6 Just a Work Day
Date: Tuesday, August 16, 2011
Weather: Overcast and Sprinkles, Temperature 60-70 degrees F
Location: Eel Pond, Woods Hole, Massachusetts

There was no sunshine today but at least the pouring rain stopped. We started our day with a little boat work. I varnished the pieces of wood that will hold the gimbal brackets for the new stove and Mark cleaned the Stayloc fittings on the bottom of our stays because they were showing signs of rust. We then drove into Falmouth where I delivered Mark to West Marine and then I went to a garage to see if they could investigate the muffler problem we first encountered yesterday when we were driving through the deep water on the roads. As we suspected, a cursory look from the mechanic indicated that the tail pipe has separated somewhere near the catalytic convertor, but I have to take the car in tomorrow morning at 8 am to put it on the lift and get a more complete picture of the problem.

It was laundry day, so I headed to Heather’s after checking in that the garage and did laundry for us and for Heather and Jed. The time passes quickly, and soon I headed out to pick up the boys from Summer Camp. Sam has a fantastic imagination and each day he plays a pretend trip that we take when we get in the car. Today we went to the ‘capitol’ in Boston and had a little picnic (pieces of watermelon he hadn’t eaten for lunch), and then headed home. Jonah usually falls asleep on the way home, but he was wired today. He did fall asleep, but not soundly, so when I tried to get him out of the car seat, he was wide awake and still wired. It took almost an hour to get both boys settled in for a nap, but finally they were both sleeping peacefully. Tomorrow the boys have morning dentist appointments, so Heather is taking the day off, and that means Oma has the day off. Mark is not working at West Marine tomorrow, so we will spend the day combing through the new website searching out the problems. We talk with Justin tomorrow evening, so we’ll have our list ready. Mark works on Thursday, then he has the weekend off. At this point the weather for the weekend doesn’t look great, but if that improves, we might go for a weekend sail.

Day 295, Year 6 It’s Raining, It’s POURING

Day 295, Year 6 It’s Raining, It’s POURING
Date: Monday, August 15, 2011
Weather: Rain All Day, Temperature 69 degrees F
Location: Eel Pond, Woods Hole, Massachusetts

It’s raining, it’s POURING. We don’t remember ever seeing so much rain in August during the fifteen years that we lived in Concord and in Boston, but we sure are seeing the rain this August and especially today. There was so much rain that the drains on Heather and Jed’s street were blocked and all the water was pouring down the hill and into their garden. Some water is good, but it was literally a small pond. The puddles on the road were deep so we took Sam and Jonah puddle stomping after nap. We were still out stomping in puddles in the pouring rain when we saw Heather and Jed heading down Vidal Avenue. Heather hopped out of the van and stomped with us back home. We were all soaked, but it was great fun. And with this much rain, you are going to be soaked no matter what you do, so you might as well have some fun. But when we got back to Woods Hole and found that our dinghy was so full of water that it was more than ankle deep after less than six hours, I started getting worried. This is a lot of rain.

I’m writing this log while I’m waiting to be able to heat up some chili leftovers for dinner. We removed the old stove this morning and it is sitting on the back deck waiting to be taken to shore when the rain stops. But even in the pouring rain, we brought the new stove to the boat and got it set in place before we had to leave to pick up Sam and Jonah. Right now Mark is carefully reading the instructions and figuring out how to light the burners and the oven. This stove uses an AA battery for the start function and the battery that came with it had no charge left. So we had a moment of anxiety when nothing would light. When we installed a new battery, all was fine. So now I can go heat up the chili and warm up the boat a little in the process.

110815 Day 295 Cape Cod, USA–The New Galley Stove