Day 119, Year 4: World’s Largest Custom Built Sail Loft

Day 119, Year 4: World’s Largest Custom Built Sail Loft
Date: Wednesday, February 18, 2009
Weather: Sunny, Beautiful Day; Lightening and Sprinkles at Night
Location: Boat Lagoon Marina, Phuket Island

Today we visited Rolly Tasker Sailmakers in Phuket Town. The sign inside claims this to be the world’s largest custom built sail loft with 9038 square meters of floor space. It is huge. It is certainly the largest sail loft we have ever seen and we were amazed at what they offer for sale. Every piece of hardware you might need for sails and rigging can probably be found there. It was truly overwhelming. We were actually out looking for RG 213 coax cable to connect our VHF radio to the antenna. The old cable needs to be replaced and we found out last night that they don’t have it here in the Boat Lagoon and the cost of ordering it was out of sight. We didn’t find coax cable at Rolly Tasker, but we did see Piet Hein of Double Dutch and Steve of Oz and spent an hour or so just looking around. The location of Rolly Tasker was south toward Ao Chalong, so we drove on down there to go to the best dinghy repair shop we have seen in all of our travels. We needed a new handle for the front of the dinghy as our current one pulled out sometime in January. We got that and on the way back to the Boat Lagoon we stopped at Phuket Marine Electronics and found what we (and they) believe to be the equivalent of RG 213 cable. This is labeled as RG 8A/U here but it is much larger than normal RG 8. It looks right, but it was so much cheaper than we expected that we are just not sure. If anyone out there knows more about this than us, please let us know!

Work on Windbird continues. The hull sanding is complete and today was spent sanding the cabin top, cockpit, and the mast and boom. The welder from Nop’s stainless shop showed up today and secured the spot welds so all the stainless could be removed and taken to the shop for final welding and polishing. We worked on hardware inventory and started the hardware cleaning process. There are loads of stainless screws, bolts, nuts, washers, pulleys, cleats, and on and on that need to be soaked in diesel fuel and then cleaned to get rid of the old caulk before they are put back on Windbird with new caulk. Mark started today with the big items like the winches off the mast and will continue on tomorrow.

We had dinner here in the Boat Lagoon tonight with Susan and Richard of Sea Bunny and Nannette and Stuart of Truest Passion. Nannette and Stuart are just here for a few days getting a few repairs and getting the boat cleaned and polished. Richard and Susan are our new neighbors across the way from Windbird. Sea Bunny is a 1985 Halberg-Rassey that needs a new teak deck. They came in on Monday and already the old teak is mostly off. The speed of the work done here is amazing. We did learn at dinner tonight that we need to go to have our Visa renewed tomorrow instead of Friday. Evidently if you go in on the last day before your Visa expires you can sometimes get fined for not coming in ahead of time. Not sure we understand this, but we won’t take any chances. So tomorrow morning we will head back to Phuket Town to get the Visa extensions and then back here for more boat work.

090218 Day 119 Boat Lagoon, Phuket, Thailand–Visit to Rolly Tasker

Day 118, Year 4: Back to Normal

Day 118, Year 4: Back to Normal
Date: Tuesday, February 17, 2009
Weather: Sunny and Beautiful
Location: Boat Lagoon Marina, Phuket Island

After yesterday’s frenetic pace, today seemed a little more normal. Of course, there’s not a whole lot that is normal about our lives anyway. Boat work is progressing nicely. Most of the primer put on Sunday is coming off in the sanding process, as it should be. The arch is almost ready to go to the shop to do the final welding. We made our down payment on the canvas work that will be done once the boat is mostly back together. I went food shopping while Mark went to the hospital to get his “all clear” report on the infection he has had for about six weeks now. Hurray! I did laundry, catalogued half of the hardware taken off the cabin top and mast, put the last of cleaned and dried lines away, and with what little time was left in the afternoon, I continued to work on editing and naming photos for the web. I finished and Mark uploaded to the website all photo folders that weren’t already on the site from our time in Thailand and the few days from Bali that weren’t done earlier. Now I’m working my way back through Malaysia to Singapore. Slow, slow process.

I’m hoping most of the on-site stainless work will be finished tomorrow morning so the paint crew can start standing the cabin top. Windbird should be ready for another coat of primer on Thursday and we sure don’t want to slow that process down. On Friday of this week our two-month Thai Visa needs to be extended, so we will have to head to Phuket Town to do that. We like to be here on paint days to watch over the process, so hopefully the timing will work out and painting will be done on Thursday.
We still haven’t made our plane reservations for coming to the US in April, so maybe that will be tonight’s job.

090217 Day 118 Boat Lagoon, Phuket, Thailand–Preparing for Second Primer Coat
090217 Day 118 Boat Lagoon, Phuket, Thailand–Work Begins on New Stainless Arch and Handrails

Day 117, Year 4: Incredible

Day 117, Year 4: Incredible
Date: Monday, February 16, 2009
Weather: Sunny and Beautiful
Location: Boat Lagoon Marina, Phuket Island

In the last twenty-four hours we have found so many things to be incredible. Last night we talked to my sister-in-law Sue in Florida and she remarked about how incredible it was that we were talking from Thailand to the US on a computer. Then we talked to Heather, Jed, and Sam and enjoyed the incredible video of Sam playing in the tent he was given by his Goldstone grandparents. He would look at us on the screen, play a while, and then come back and look at us again. With Skype, we can take still photos of Sam while we are talking to him. I’ve included one of those in the photos with this log. Sam has been very sick for the past few days, so he started to fade towards the end of our conversation. He was on his daddy’s shoulder when we said goodbye but he heard us and waved his little hand goodbye without even looking at us. Incredible.

And then there was today. We started by talking to Justin and Jo and hearing that things are going well in New Mexico. And then we had to run to the boat to meet Nop, the stainless guy. All of sudden things are moving very fast again. Nop and his crew moved in and set up their shop next to Windbird. They measured the stainless pieces and cut them right on the spot, carried the measured and cut pieces up to the deck of the boat to fit them, bend them, and then spot weld the entire structure.
An engineer stayed on site all day directing the work, and by the end of the day we have the skeleton of an arch and stainless rails from our gate to the back of the boat. By the end of the day tomorrow, the total structure will be spot welded and then removed to the real shop for finishing. We found this pretty incredible. And while this was happening, Oh’s crew was filling in the rough spots on Windbird’s hull, spraying the whole hull with colored spray paint, and then beginning the long board sanding process to smooth everything out to ready it for the next primer coat. The colored spray paint is put on just so they will know where they have sanded. We talked with Oh, chose the color of paint we will be using, and that has been purchased and is ready and waiting. Oh says we could be applying AwlGrip by the end of next week. Incredible! And then there was the appearance of Mazrizal, the manager of Rebak Marina back in Langkawi. Mark was at the boat when Mazrizal stopped by. I was
back in the apartment but had headed over to the boat to get Mark to take him to lunch. When I saw them talking, all I could say is, “You are in the wrong place.” Mazrizal is here for a couple of days just scoping out the various marinas on Phuket Island. He was amazed at the services available here and we talked with him about why we chose to have the boat painted here instead of at Rebak. We will be returning there as soon as we are finished here and we also talked to him about that. He joked
that we will need a slip with a balloon fender all around to protect our new paint job. He was joking, but I thought it sounded like a splendid idea!

So things are moving fast here. In between all of the visits to the boat to approve what is happening, I continue to work on editing and posting photos on the website. I really thought I would have lots of down time to do this, but it is not looking like that will be the case. This is good, as it means we really might make it to New Mexico in time for Wee Gerbil’s birth, and that is the most important thing to us right now. So we aren’t having the down time we thought we would have, but we are finally feeling good enough about work progress to go ahead and book our tickets home. If the work schedule continues as it has, we will headed back to Rebak in Malaysia by the end of the first week in April and be New Mexico bound in mid-April.

090216 Day 117 Boat Lagoon, Phuket, Thailand– Living on Land

Day 116, Year 4: Hearts in the Pool

Day 116, Year 4: Hearts in the Pool
Date: Sunday, February 15, 2009
Weather: Sunny and Beautiful
Location: Boat Lagoon Marina, Phuket Island

What a wonderful Valentine’s dinner we had at Chandara Resort last evening. We have eaten there before and found their food to be unremarkable, but their special holiday dinners are spectacular. After doing our final inspection of Windbird’s first coat of primer, we drove north to Ao Po and met Jean and Ken of Renaissance 2000 at Chandara. The special Valentine’s dinner was being served by the pool, so we walked that way and were immediately in awe at how beautifully they had the pool deck decorated with tables and lights. The pool had beautiful hearts covered with flower petals floating all over. The food was wonderful, the service the best we’ve ever had anywhere, and everything was served in a heart shape. For starters we had seafood terrine with papaya salsa. Then came the lobster consume followed by a main of either pork tenderloin or poached salmon. Again everything was served in a heart shape and decorated with hearts. The sweetheart tiramisu was to die for and the chocolate truffles were decadently rich. It was a lovely meal with lovely friends. Jean and Ken will be leaving for Lankawi in a week or so and from there they will cross the Indian Ocean to South Africa. They are from Hamilton, near Toronto in Canada, so hopefully we will see them once we return home.

Today we worked on our computers in our apartment most of the day. I have hours of photo editing and naming to do and Mark is trying to organize the information on our three computers and the back-up hard drives. It is tedious work but we are enjoying the time to do this. This evening we went up to the rooftop deck and just enjoyed the breeze and the views. We are now sitting in our apartment with the air conditioning off for the first time since moving in and the sliding glass doors on both sides open to the outside. When the mosquitoes arrive, we’ll have to shut up, but for now it is delightful. We will be talking to Heather, Jed, and Sam tonight as well as my sister-in-law Sue and my neice Lynn. In the morning we will talk to Justin and Jo and my sister Patsy, so I’ll have to report on family news in tomorrow night’s log.

090215 Day 116 Boat Lagoon, Phuket, Thailand–Valentine's Dinner at Chandara

Day 115, Year 4: Fantastic Valentine’s Day Gift

Day 115, Year 4: Fantastic Valentine’s Day Gift
Date: Saturday, February 14, 2009
Weather: Perfect-85 degrees F; 65% Relative Humidity
Location: Boat Lagoon Marina, Phuket Island

Windbird got her first coat of primer today. She’s white again and looks great! Neither Mark nor I could think of a better Valentine’s Day gift, so we will celebrate our Valentine’s evening out with glee. I am posting photos of the progress from the day the mast was removed to today with this log. We were taken out of the water only seventeen days ago and every single day we feel like there has been phenomenal progress. So far, so good. And the weather today was fantastic for painting–low
humidity and temperatures in the 80’s.

090214 Day 115 Boat Lagoon, Phuket, Thailand–Mast Off to First Primer Coat

Day 113, Year 4: Windbird Progress Report

Day 113, Year 4: Windbird Progress Report
Date: Thursday, February 12, 2009
Weather: Sunny Weather; West Winds Blowing
Location: Boat Lagoon Marina, Phuket Island

We got an email from Shirena today telling us that strong winds are blowing in from the west. That’s not good news for them as they are headed up the west coast of Phuket Island tomorrow, but hopefully the anchorages won’t be too rough. We started our day with another trip to the hospital where Mark got his third and last antibiotic IV. He is now back on five days of antibiotic pills and then he will go back for another check-up. While he was at the hospital, I went back to the Market Place supermarket
and wrote down what is available there with the price. I will use this when preparing for the Indian Ocean crossing next year. Prices will be slightly different, but I can use the information now to compare one store against another. We returned to the Boat Lagoon and had lunch in our apartment and then headed over to check on Windbird’s progress.

The exciting news is that the first coat of fairing compound will be applied to the entire hull and the cabin top on Saturday. Luck, the young man in charge, told us that we could come to Windbird tomorrow to go inside and check on things and get some items we need, but that after the first coat on Saturday, we are not to go into the boat again until Monday when the crew arrives to check things out. That’s perfect timing for us as the list of things we need has been growing dialy. But we are just
so excited that the first coat of whatever is going on so soon. We were also excited that the crew has started sanding the mast. The sooner that is done, the better. It will take us about a week to put it back together based on what we saw Eric and Robyn of Scorpido do, so it will be wonderful if the mast is finished before the boat and we can work on that while Oh’s crew puts the finishing coats on Windbird. After visiting Windbird, we walked up the steps to the building housing a long row of
yacht services. Just up from Windbird is a small chandlery run by a young woman named Toi. Another young woman that works for Toi, Noo, has spent a couple of afternoons sanding Windbird with Oh’s crew. I had just taken a picture of the crew on break at Windbird, so I showed the photo to Noo and she and Toi were able to name the different crew members for us. That is how we learned that the young man who works as site supervisor is Luck. Oh sometimes calls him “L” and now we know why.

We spent the latter part of the afternoon starting to work on getting photos from the past months organized. We have barely made a dent, but we have started. I continue working on getting all of the lines from Windbird washed and hung to dry and I should complete that job by Saturday. So we are moving along.

We are thinking of Heather (our daughter) tonight. For the first time, she is hosting the Cape and Islands public radio station talk show. It is a special program honoring the 200th birthday of Darwin, so the station asked her, as science reporter, to do the program. Hosting a program is very different from filing science news reports that can be edited. The talk show is live, so we are sending our most positive thoughts your way, Heather. We’ll try to listen to the live broadcast on the internet,
but if the bandwidth is too slow to give us a good signal we will listen later to the podcast. Again, isn’t the internet just amazing?!